QUICK LINKS
SCROLL TO FIND TOPIC/PRODUCT
Court Configurations
Cricket Pitch Cover System
Cricket Pitches & Practice Nets
Golf - Backyard Putting Greens
Golf - Club Applications
Golf - Course Applications
Grass - For Front and Back Yards
Grass - For Campsites
Grass - For Golf
Grass - For Median Strips & Roundabouts
Grass - For Parks & Gardens
Grass - For Playgrounds
Grass - For Sports Courts & FieldsMatting - Anti-Fatigue
Matting - For Gyms & Sports
Matting - For Locker Rooms
Matting - For Pavements
Matting - For Swings & Slides
Matting - For Wet Areas
MSPRO®10 Grass
MSPRO®19 Grass
MSPRO®25 Grass
MSPRO®45 Plush
MSPRO®45 Rebound
Multi-Sport Courts
Rubber - Animals for Playgrounds
Rubber - Safety Logs
Rubber - Site Pour Surfacing
Safety Logs - Rubber
Site Pour - Rubber
Soft-fall Playground System
Speed Humps
Sports Court Equipment & Padding
Sports Courts
Stair Tread & Covers
Surface Reinforcement - Ground Cell
Sustainable Sports Fields
Swing & Slide Mats
Tent Site Grass
Traffic Control - Speed Humps
Traffic Contol - Wheel Stops
Turf Tile - 1m x 1m
Turf Tile - Interlocking
Water Harvesting Solutions
Water Tanks - Underground
Wheel Chair Ramps
Wheel Stops
For all sales enquiries please
contact us on the toll free number
listed or via email on
sales@geckograss.com.au
SERVICING ALL AREAS
AUSTRALIA WIDE
Phone:1800 255 943
Fax:1800 608 380


Campsite Grass Installation
|
How Our Certified Gecko Installers lay synthetic campsite grass |
||
|
The perfect solution to worn campsite areas. Achieve an attractive method of creating specific site boundaries without the need for watering.
|
Step One: b) The frame is laid within the excavated area and checked to ensure that it is square. Step Three : b) The gaps surrounding the frame are firmly filled with the soil retained from step 1 so that the frame is securely in place. Step Four : b) An additional 5mm of crusher dust is added and compacted with the whacker, level with the bottom section of the frame. See cross section (4c). Final Steps: b) The grass is fixed in position by nailing it to the frame using 20mm clouts at 300mm intervals. c) The area is finished by spreading 15mm of silica sand in-fill evenly through the grass. The sand is brushed in with a hard bristled broom until it is no longer visible. View project case study on
|
|
![]() At Commencement - Step 1 |
![]() Step 2a |
|
![]() Step 2b |
![]() Step 2c |
|
![]() Step 3a |
![]() Step 3b |
|
![]() Step 3c |
![]() Step 4a |
|
![]() Step 4b |
![]() Step 4c |
|
![]() Final Steps |
![]() Completed Project |
|
![]() Before |
![]() After |
|

Recommend this site
Bookmark this site!













